All ISTQB exams
ISTQB CTAL-TA: Certified Tester Advanced Level Test Analyst (CTAL-TA) v4.0
What the CTAL-TA exam covers and what it costs, with a free 30-question practice test and an explanation for every answer.
- Duration
- 120 minutes
- Questions on the exam
- 45
- Passing score
- 51 of 78 points
- Level
- Professional
- Topic areas
- 5
- Free practice questions
- 30
- Full question bank
- 112 questions
What the CTAL-TA exam covers
The topic areas in our CTAL-TA question bank, with each one's share of the 112 practice questions.
CTAL-TA cost and format
| Exam code | CTAL-TA |
|---|---|
| Certification | Certified Tester Advanced Level Test Analyst (CTAL-TA) v4.0 |
| Vendor | ISTQB |
| Level | Professional |
| Status | New |
| Delivery | Through ISTQB Member Board exam providers; CTFL required first |
Last checked November 10, 2026 against the official ISTQB exam page.
CTAL-TA sample questions
The first 5 questions from the free practice test. Open a question to see the answer and why it is right.
Question 1The Tasks of the Test Analyst in the Test Process
A test analyst joins the refinement meetings of an agile team for the first time. Which benefit does this early involvement bring to the testing effort?
- AIt lets the test analyst find ambiguous requirements and missing acceptance criteria before code is written, when fixes are cheapest
- BIt removes the need for any test execution in later iterations, since the analysis is treated as a complete verification of the product
- CIt lets the test analyst write the production code so that the developers can concentrate on the testing tasks
- DIt fixes the release date for the product so that stakeholders can plan their marketing campaigns in advance
Show answer and explanationHide answer
Correct answer: AEarly involvement lets the test analyst find ambiguities and gaps before development, when defects are cheapest to fix. The other options are wrong: later test execution is still needed, the analyst does not take over production code, and testers do not set release dates.
Question 2The Tasks of the Test Analyst in Risk-Based Testing
A team holds a workshop to list the product risks of a new online banking app. The test analyst then gives each risk a likelihood and an impact rating. Which step of risk-based testing is this?
- ARisk monitoring, which tracks how the risk levels change through the project and reports the current status
- BTest completion, which summarizes the final risk status in the closing report for the stakeholders
- CRisk mitigation, which reduces the likelihood of failure by changing the design or code before testing begins
- DRisk assessment, which estimates the likelihood and impact of each identified risk to derive its risk level
Show answer and explanationHide answer
Correct answer: DAssigning likelihood and impact to identified risks is risk assessment, which produces the risk level. Monitoring, mitigation and completion reporting are other steps and do not assign these ratings.
Question 3Test Analysis and Test Design
A form field accepts whole-number ages from 18 to 65. Which set of inputs forms one valid equivalence partition for this field?
- AOnly the two values 18 and 65, because they are the only inputs that sit on the edges of the valid range
- BOnly the value 30, because it is a typical input that represents the whole valid range for the field
- CAll negative integers, which form a valid partition because the system is expected to accept each of these values
- DAll integers from 18 to 65, because the system is expected to treat every value in this range the same way
Show answer and explanationHide answer
Correct answer: DAn equivalence partition is a set of values the system should treat the same way, so all integers from 18 to 65 form one valid partition. Edge values alone, a single typical value, and negative numbers (an invalid partition) do not form a valid partition of the field.
Question 4Test Quality Characteristics
A test analyst checks that a tax calculation returns exactly the amount required by the rules for each set of inputs. Which quality sub-characteristic is being tested?
- ALearnability, which checks how quickly a new user can understand how to use the calculation feature
- BFunctional correctness, which checks that results are accurate to the degree of precision the requirements need
- CInstallability, which checks how reliably the product can be installed and removed on a target platform
- DCo-existence, which checks that the product works while sharing resources with other products on the same system
Show answer and explanationHide answer
Correct answer: BFunctional correctness is the degree to which results are accurate to the required precision, which is what the tax check tests. Learnability, co-existence and installability are other quality characteristics and do not describe checking the accuracy of results.
Question 5Software Defect Prevention
Which practice is a defect prevention practice rather than a defect detection practice?
- AApplying a shared coding standard and checklists during development to avoid common mistakes before coding
- BRunning the regression test suite after every change to find any new failures in the existing functions
- CExecuting dynamic tests on the completed system to reveal failures that appear under realistic inputs and loads
- DLogging every failure found during system testing into the defect management tool with its severity
Show answer and explanationHide answer
Correct answer: ACoding standards and checklists applied during development stop common mistakes from being introduced, which is prevention. Regression runs, dynamic system tests and failure logging all detect defects that already exist.
How to prepare for CTAL-TA
- Read the official ISTQB outline first (exam page), so you know exactly what is in scope.
- Give the most time to The Tasks of the Test Analyst in the Test Process and The Tasks of the Test Analyst in Risk-Based Testing: together they make up 42% of the questions.
- Take the free 30-question practice test and note which topics you miss.
- Go back to the weak topics, then test again. A practice score shows where to study; it does not predict your exam result.
Full CTAL-TA question bank
All 112 questions with answers and explanations, as a PDF, an online practice exam, or both.
The full 112-question bank for CTAL-TA is in final review. The free practice test is open now.
Start the free practice testCTAL-TA FAQ
Related exams
| Exam | Vendor | Level |
|---|---|---|
| CTFL: Certified Tester Foundation Level (CTFL) v4.0 | ISTQB | Foundational |
| CTAL-AT: Certified Tester Advanced Level Agile Tester (CTAL-AT) v2.0 | ISTQB | Professional |
| CT-FT: Certified Tester Finance Testing (CT-FT) | ISTQB | Specialty |
| CT-GenAI: Certified Tester Testing with Generative AI (CT-GenAI) | ISTQB | Specialty |
| CT-AI: Certified Tester AI Testing (CT-AI) v2.0 | ISTQB | Specialty |
| DVA-C03: AWS Certified Developer - Associate (updated) | AWS | Associate |