All NVIDIA exams
NVIDIA NCP-ARI: NVIDIA-Certified Professional: AI Rack and Interconnect
What the NCP-ARI exam covers and what it costs, with a free 30-question practice test and an explanation for every answer.
- Exam fee
- $400 USD
- Duration
- 120 minutes
- Passing score
- Pass/fail
- Level
- Professional
- Topic areas
- 7
- Free practice questions
- 30
- Full question bank
- 100 questions
What the NCP-ARI exam covers
The topic areas in our NCP-ARI question bank, with each one's share of the 100 practice questions.
NCP-ARI cost and format
| Exam code | NCP-ARI |
|---|---|
| Certification | NVIDIA-Certified Professional: AI Rack and Interconnect |
| Vendor | NVIDIA |
| Level | Professional |
| Status | Active |
| Languages | English |
Last checked October 22, 2026 against the official NVIDIA exam page.
NCP-ARI sample questions
The first 5 questions from the free practice test. Open a question to see the answer and why it is right.
Question 1High-Density Cabling Installation for AI Clusters
A technician is told that a switch uses OSFP ports. Which statement about OSFP and QSFP form factors is correct?
- AForm factor does not matter as long as the speed matches, because the cage is rated for speed
- BOSFP and QSFP are the same size, so modules can be swapped freely between the two cage types
- COSFP and QSFP are different form factors, and the modules are not interchangeable
- DQSFP is a copper-only standard and OSFP is fiber-only because the cage pinout differs by family
Show answer and explanationHide answer
Correct answer: COSFP and QSFP are distinct mechanical form factors, so the transceivers and cages must match the port type. Matching speed alone does not make the modules compatible.
Question 2AI Infrastructure Basics for Data Centers
A technician installs rack PDUs on a three-phase feed that supplies a high-density AI rack. Why must the load be balanced across the phases?
- ATo raise the negotiated speed of the rack's Ethernet and InfiniBand uplinks during peak traffic
- BTo keep the current on each phase within its rated limit and avoid overloading one phase
- CTo allow the rack to skip the grounding step during commissioning if the PDU phases are balanced
- DTo cut the number of interconnect cables needed between the servers by consolidating onto a patch panel
Show answer and explanationHide answer
Correct answer: BUnbalanced phase loading can overload one phase even when total capacity is sufficient, which risks breaker trips and unsafe conditions. Balancing spreads the current evenly, and it does not affect link speed, grounding, or cable count.
Question 3Testing, Verification, and Documentation
Which instrument measures the optical power loss of an installed fiber link so the technician can confirm it is within budget?
- AA thermal camera pointed at the rack door
- BA label printer
- CA multimeter used for resistance checks on copper
- DAn optical power meter
Show answer and explanationHide answer
Correct answer: DAn optical power meter, typically used with a light source, measures received power and loss against the link budget. A multimeter and thermal camera do not measure optical loss, and a label printer does not test links.
Question 4Safety, Standards, and Compliance
Which two practices are required when performing electrical work on energized or high-power AI rack equipment? (Choose two.)
- ARemoving the grounding conductor while equipment is energized
- BFollowing lockout/tagout procedures to isolate and verify the power source
- CWearing the personal protective equipment specified for the environment
- DWorking alone to finish the task faster
Show answer and explanationHide answer
Correct answer: B, CLockout/tagout isolates hazardous energy, and PPE protects workers from electrical and arc hazards. Working alone and removing grounding conductors increase the risk of serious injury.
Question 5Pre-Deployment Planning and Site Assessment
Before racks are delivered, what must a site survey confirm about the installation floor?
- AThat no cabling is needed in the room because power and data will reach the racks by wireless links
- BThat the building has no fire exits in the data hall because the design uses a single corridor
- CThat the floor has structural load capacity for the weight of the fully loaded racks
- DThat the floor color matches the company brand palette used in the lobby signage and the offices
Show answer and explanationHide answer
Correct answer: CAI racks are very heavy, so the floor must support their fully loaded weight. Color, cabling, and fire exits are not the purpose of a load-capacity survey.
How to prepare for NCP-ARI
- Read the official NVIDIA outline first (exam page), so you know exactly what is in scope.
- Give the most time to High-Density Cabling Installation for AI Clusters and AI Infrastructure Basics for Data Centers: together they make up 45% of the questions.
- Take the free 30-question practice test and note which topics you miss.
- Go back to the weak topics, then test again. A practice score shows where to study; it does not predict your exam result.
Full NCP-ARI question bank
All 100 questions with answers and explanations, as a PDF, an online practice exam, or both.
Both formats together. The best value.
Instant access after payment, with 90 days of updates. Checkout is on our store, AIExamCerts.
NCP-ARI FAQ
Related exams
| Exam | Vendor | Level |
|---|---|---|
| NCA-AIIO: NVIDIA-Certified Associate: AI Infrastructure and Operations | NVIDIA | Associate |
| NCP-GENL: NVIDIA-Certified Professional: Generative AI LLMs | NVIDIA | Professional |
| NCA-GENM: NVIDIA-Certified Associate: Generative AI Multimodal | NVIDIA | Associate |
| NCP-AII: NVIDIA-Certified Professional: AI Infrastructure | NVIDIA | Professional |
| NCA-GENL: NVIDIA-Certified Associate: Generative AI LLM | NVIDIA | Associate |
| NCP-AAI: NVIDIA-Certified Professional: Agentic AI | NVIDIA | Professional |