All CompTIA exams

Free SOT-001 practice test: 30 questions with answers

30 original questions for CompTIA SecOT+, drawn from every topic area. Answer each one to see whether you got it right and why. No sign-up.

Free questions
30
Full bank
112 questions

SOT-001 exam guide: topics, cost and format

All 30 SOT-001 questions with answers

The same questions as the test above, grouped by exam topic. Open any question to see the answer and explanation.

OT Systems and Safety Foundations (5 questions)

  1. Question 1

    Which safety practice requires placing a personal lock and tag on an energy isolation point so that equipment cannot be re-energized during maintenance?

    1. ANetwork segmentation between production zones
    2. BChange freeze during peak production periods
    3. CLockout/tagout energy isolation procedure
    4. DDefense in depth across layered security controls
    Show answer and explanation
    Correct answer: C

    Lockout/tagout isolates hazardous energy sources and uses locks and tags so equipment cannot be re-energized while a worker is servicing it. Network segmentation, change freezes, and defense in depth are valid security or scheduling controls, but none of them isolates energy for a worker.

  2. Question 2

    A bottling line must open a valve within milliseconds of a level sensor reading and must keep running even when the HMI is offline. Which device is designed to execute this logic locally?

    1. AProgrammable logic controller running the control logic locally
    2. BHistorian server storing archived level readings for trends
    3. COperator dashboard showing live graphics on a control room display
    4. DEnterprise firewall filtering traffic between plant and corporate zones
    Show answer and explanation
    Correct answer: A

    A PLC executes control logic locally on field-level hardware, so it can act within its scan cycle even when an HMI or network link is unavailable. A historian stores data, a dashboard displays it, and a firewall filters traffic, so none of them runs the valve logic.

  3. Question 3

    An operator must watch tank levels at several remote pumping stations from one control center and send new setpoints to each station across a wide area. Which system category best fits this function?

    1. ASCADA supervisory control and data acquisition
    2. BLocal HMI panel mounted on a single machine
    3. CHistorian appliance storing archived process values
    4. DEngineering workstation used for ladder logic edits
    Show answer and explanation
    Correct answer: A

    SCADA supervises geographically dispersed processes, collecting data and sending setpoints across wide areas from a central site. A local HMI, a historian that stores values, and an engineering workstation used for programming do not provide that supervisory function.

  4. Question 4

    Which two statements about Modbus are accurate in an OT environment? (Choose two.)

    1. AModbus is a proprietary protocol limited to a single vendor's devices
    2. BModbus is widely used for communication between HMI or SCADA software and PLCs
    3. CModbus encrypts all traffic by default and needs no key management
    4. DModbus traditionally has no built-in authentication or message encryption
    Show answer and explanation
    Correct answer: B, D

    Modbus is an openly documented protocol used widely between HMI, SCADA, and PLC devices, and its traditional design has no built-in authentication or encryption. The single-vendor and default-encryption statements are false, so those options are wrong.

  5. Question 5

    A plant engineer proposes applying the monthly patch schedule used for office laptops to the HMI servers that run a continuous chemical process. Which concern is the strongest reason to challenge this proposal?

    1. ARegular patch cycles stop every exploit against OT networks in practice
    2. BOffice patch schedules are unsafe for any networked device in every setting
    3. CHMI servers in most plants do not run an operating system that can be patched
    4. DLive process systems need uptime checks and vendor approval before patching
    Show answer and explanation
    Correct answer: D

    A continuously running process cannot be interrupted arbitrarily, so patches need uptime planning, testing, and vendor validation where required. The other options contain false claims: no patch cycle stops every exploit, and HMI servers usually run patchable operating systems.

OT Risk Management (5 questions)

  1. Question 6

    A water utility buys insurance that pays for the financial losses caused by a possible control system outage, but it makes no change to how likely that outage is. Which risk treatment option is this?

    1. ARisk avoidance by removing the risky process entirely
    2. BRisk transfer through insurance coverage for losses
    3. CRisk mitigation through added technical safeguards
    4. DRisk acceptance with documented management sign-off
    Show answer and explanation
    Correct answer: B

    Transfer moves the financial impact to a third party such as an insurer without reducing the likelihood of the event. Avoidance removes the activity, mitigation adds controls that lower likelihood or impact, and acceptance keeps the risk knowingly.

  2. Question 7

    A plant risk register rates a ransomware event on the historian as high likelihood and high impact, and rates a lost visitor badge as low on both scales. The team has a limited budget this quarter. How should it prioritize treatment?

    1. AAddress the lost badge first because physical losses are easier to fix
    2. BTreat both risks equally because qualitative ratings cannot be ranked together
    3. CAddress the ransomware risk first since it is high on both scales
    4. DAccept the ransomware risk because historians are not safety-critical systems
    Show answer and explanation
    Correct answer: C

    A high-likelihood, high-impact risk belongs at the top of the treatment queue, so budget goes there first. The lost badge is low on both scales, and treating qualitative ratings as unrankable or accepting the historian risk ignores that ransomware can disrupt operations.

  3. Question 8

    Which two activities belong to the risk monitoring phase of an OT risk program? (Choose two.)

    1. ASelecting a vendor for a new PLC purchase order
    2. BVerifying that implemented controls still operate as designed
    3. CDrafting the initial risk assessment methodology document
    4. DTracking key risk indicators against thresholds over time
    Show answer and explanation
    Correct answer: B, D

    Monitoring checks over time that implemented controls still work and that risk indicators stay within agreed thresholds. Vendor selection is procurement and drafting a methodology is planning, so neither is monitoring.

  4. Question 9

    An engineer wants to deploy a revised PLC logic program to a running line during day shift. The change board requires a tested copy in a staging environment and a documented rollback plan before it approves the change. What is the main purpose of these requirements?

    1. ATo let IT approve logic changes without consulting plant operations staff
    2. BTo make sure a failed change can be reversed to a known safe state
    3. CTo give the vendor a formal record of the engineer for warranty claims
    4. DTo remove the need for documentation once a change succeeds on the line
    Show answer and explanation
    Correct answer: B

    Change management in OT relies on testing and a rollback path so that a failed change can be undone and the process returned to a known safe state. Bypassing operations review, warranty records, and dropping documentation are not purposes of these controls.

  5. Question 10

    Which standard series is most closely associated with cybersecurity requirements for industrial automation and control systems?

    1. AISO/IEC 27001 information security management systems
    2. BIEC 62443 series for industrial control system security
    3. CPCI DSS requirements for protecting cardholder data environments
    4. DGDPR rules for processing personal data of residents
    Show answer and explanation
    Correct answer: B

    The IEC 62443 series defines security requirements and practices for industrial automation and control systems. ISO/IEC 27001 covers general information security management, PCI DSS covers payment card data, and GDPR covers personal data, so none is specific to industrial control systems.

OT Threat Intelligence (5 questions)

  1. Question 11

    An analyst documents a suspected intrusion at a substation by recording who is behind it, which malware and tools were used, which servers the attacker controlled, and which utility system was targeted. Which analytic model is the analyst applying?

    1. AMITRE ATT&CK Enterprise matrix for tactics and techniques
    2. BCyber Kill Chain stages for tracking attack phases
    3. CDiamond Model of intrusion analysis for adversary pivots
    4. DPyramid of Pain for judging indicator durability over time
    Show answer and explanation
    Correct answer: C

    The Diamond Model links adversary, capability, infrastructure, and victim for each intrusion event and is used to pivot across related activity. Kill chain stages, the ATT&CK matrix, and the Pyramid of Pain are useful references but do not center on those four linked elements.

  2. Question 12

    Which MITRE resource is designed to catalog adversary tactics and techniques observed against industrial control system environments?

    1. ACVE list of publicly disclosed vulnerabilities
    2. BNIST SP 800-88 media sanitization guidance
    3. CMITRE ATT&CK for ICS matrix of adversary techniques
    4. DCIS Benchmarks for hardened system configurations
    Show answer and explanation
    Correct answer: C

    The ATT&CK for ICS matrix catalogs adversary tactics and techniques observed against industrial control systems. CVE entries describe individual vulnerabilities, NIST SP 800-88 covers media sanitization, and CIS Benchmarks give configuration baselines, so none of them catalogs ICS adversary behavior.

  3. Question 13

    A researcher reviews a malware family that used several zero-day exploits to spread through Windows engineering workstations. It then altered logic on Siemens S7 PLCs while feeding operators normal-looking readings. Which historic incident does this best match?

    1. AStuxnet, the sabotage malware that targeted Siemens PLCs
    2. BIndustroyer, the malware built for power grid attacks
    3. CTriton, the malware that manipulated safety system controllers
    4. DWannaCry, the worm-based ransomware campaign
    Show answer and explanation
    Correct answer: A

    Stuxnet used zero-day exploits, spread through Windows engineering systems, and changed Siemens S7 PLC logic while hiding the changes from operators. WannaCry was a ransomware worm, Industroyer targeted grid protocols, and Triton targeted safety instrumented systems, so none of them fits this description.

  4. Question 14

    A threat team's blocklist of IP addresses stops working each time the adversary rotates its servers. Which type of intelligence should the team prioritize to stay useful for longer?

    1. ADomain names used in one phishing campaign last quarter
    2. BTactics, techniques, and procedures (TTPs) of the actor
    3. CFile hashes taken from the latest malware sample collected
    4. DIP addresses of newly rotated command and control servers
    Show answer and explanation
    Correct answer: B

    TTPs describe how an adversary operates, which changes far less often than the servers, domains, or malware it swaps out. Domains, hashes, and IP addresses are indicators that an adversary can replace quickly, so they age out fast.

  5. Question 15

    A regional water utility wants alerts about ICS threats aimed at its sector and a trusted channel to share anonymized incident details with peer utilities. Which type of organization best fits this need?

    1. AInternet service provider for the utility's wide area links
    2. BManaged security service provider billed on a monthly basis
    3. CCertificate authority issuing device identity certificates
    4. DInformation Sharing and Analysis Center for the sector
    Show answer and explanation
    Correct answer: D

    An Information Sharing and Analysis Center gathers and distributes threat information within a critical infrastructure sector and supports anonymized sharing among members. An internet provider, a managed security provider, and a certificate authority do not serve that purpose.

OT Cybersecurity Architecture, Design, and Engineering (5 questions)

  1. Question 16

    A plant network places HMIs, PLCs, and the business email server on one flat subnet. The security team wants to limit how far an intruder can move after a single compromise. Which change best achieves this?

    1. APlace all devices in one large VLAN and rely on strong passwords
    2. BTurn on daily automatic updates for the business email server
    3. CGroup OT assets into zones with controlled conduits between them
    4. DEnable Wi-Fi on every HMI so operators can roam between machines
    Show answer and explanation
    Correct answer: C

    Zones and conduits, as described in IEC 62443, limit lateral movement by controlling which traffic can cross between groups of OT assets. A single flat VLAN with passwords, automatic email server updates, or roaming Wi-Fi on HMIs does not restrict movement between zones.

  2. Question 17

    Which hardware component stores cryptographic keys and can record boot measurements so that firmware and boot integrity can be verified on an engineering workstation?

    1. ANetwork interface card with a hardware offload engine
    2. BTrusted Platform Module (TPM) security chip
    3. CGraphics card with an onboard video encoder
    4. DUninterruptible power supply monitoring card
    Show answer and explanation
    Correct answer: B

    A Trusted Platform Module stores keys and records boot measurements that support integrity checks and secure boot decisions. A network offload engine, a UPS monitoring card, and a GPU encoder have no role in verifying boot integrity.

  3. Question 18

    A systems integrator must troubleshoot a PLC at a plant from another city. Security requirements are named accounts, multi-factor authentication, time-limited sessions, and session recording. Which approach best meets these requirements?

    1. ABrokered access through a monitored jump host that requires MFA
    2. BA shared vendor username kept in a shared spreadsheet file
    3. CDirect port forwarding from the internet edge straight to the PLC
    4. DA standing VPN tunnel that stays open for the entire year
    Show answer and explanation
    Correct answer: A

    A monitored jump host with MFA provides named, time-limited access and records sessions, which covers each stated requirement. Direct port forwarding, a shared spreadsheet credential, and an always-open tunnel each fail the named-account or time-limit requirements.

  4. Question 19

    Which two controls are designed to enforce one-way data flow from a process network toward a business network? (Choose two.)

    1. ABidirectional VPN with full administrative access to controllers
    2. BData diode that permits only outbound replication of historian data
    3. CShared domain administrator account for all vendor technicians
    4. DUnidirectional security gateway for one-way telemetry transfer
    Show answer and explanation
    Correct answer: B, D

    A data diode and a unidirectional gateway enforce that information can only move in one direction, which supports OT-to-IT data sharing. A bidirectional VPN with administrative access permits traffic in both directions, and a shared domain administrator account breaks accountability and least privilege.

  5. Question 20

    In IEC 62443 terms, what is a zone?

    1. AConduit, the controlled communication path between two groups
    2. BZone, a grouping of assets that share security requirements
    3. CHoneypot, a decoy system that records attacker activity
    4. DSandbox, an isolated environment for testing unknown code
    Show answer and explanation
    Correct answer: B

    A zone groups assets with shared security requirements, and a conduit is the controlled communication path between zones. A honeypot and a sandbox are security tools, but they are not zones or conduits.

OT Incident Management (5 questions)

  1. Question 21

    A plant has an approved incident response plan, trained staff, tested offline backups, and a vendor contact list, all in place before any attack occurs. Which PICERL phase does this work represent?

    1. APreparation of plans, tools, and trained staff
    2. BEradication of malicious code from affected systems
    3. CIdentification of unusual activity on controllers
    4. DLessons learned review after the incident is closed
    Show answer and explanation
    Correct answer: A

    Preparation covers plans, tools, training, and backups built before any attack happens. Identification, eradication, and lessons learned are phases that begin after an incident is detected or has been contained.

  2. Question 22

    Which two practices help maintain chain of custody for a forensic image taken from an OT device? (Choose two.)

    1. ARecording each transfer of the image with the time and handler
    2. BStoring the evidence on the HMI itself for easier access
    3. CHashing the image and recording the hash value
    4. DEditing log timestamps to match the team's schedule
    Show answer and explanation
    Correct answer: A, C

    Recording every transfer with time and handler, and hashing the image so its integrity can be verified later, both support chain of custody. Leaving evidence on the source device and editing timestamps both weaken the record.

  3. Question 23

    During an incident, the response team wants to isolate an infected engineering workstation from the plant network. What must happen before this containment step is taken?

    1. AStaff must manually remove malware from every device in the plant
    2. BOperations confirms the process can reach a safe state without it
    3. CThe vendor's support team must approve every containment step in advance
    4. DOperations must restore network connections before analysis begins
    Show answer and explanation
    Correct answer: B

    In OT, isolating a host can stop a process or remove a safety function, so operations must confirm a safe state before containment. The other options describe an unnecessary order of work, an approval chain that is not a standard requirement, or a manual cleanup that does not address containment.

  4. Question 24

    A new shift lead faces a suspected ransomware alert at 2 a.m. and needs to know which steps to take first without improvising. Which document best supports this need?

    1. AMonthly finance report summarizing costs of past outages
    2. BVendor warranty document describing hardware replacement coverage
    3. CPlaybook listing pre-approved steps for a ransomware scenario
    4. DNetwork diagram showing the physical layout of plant cabling
    Show answer and explanation
    Correct answer: C

    A scenario-specific playbook gives responders pre-approved steps to follow under pressure without improvising. A warranty document, a finance report, and a network diagram may be useful references, but they do not tell responders what to do first.

  5. Question 25

    An OT incident spans plant operations, IT, and outside vendors, and the incident commander needs a shared structure for roles, communication, and resources. Which framework is designed for this purpose?

    1. AICS4ICS, an incident command model adapted for industrial control systems
    2. BCOBIT governance control objectives for enterprise IT
    3. CITIL service management practices for help desk ticket workflows
    4. DISO 9001 quality management system requirements for production
    Show answer and explanation
    Correct answer: A

    ICS4ICS adapts the Incident Command System structure to industrial control system incidents, giving a shared model for roles, communication, and resources. ITIL, COBIT, and ISO 9001 are useful management frameworks but are not built for coordinating an OT incident response.

OT Security Operations (5 questions)

  1. Question 26

    A technician finds a device on a plant control network that does not appear in the asset inventory, and no one can confirm its firmware version. What is the best immediate step?

    1. ARemove it from the network immediately without checking its function
    2. BAssume it is harmless because it is missing from the inventory
    3. CUpdate its firmware at once so the version is known
    4. DIdentify the owner and assess it passively before changing it
    Show answer and explanation
    Correct answer: D

    An unknown device should be identified and assessed passively, since active probing or changes to a fragile device can disrupt operations. Removing it blindly, assuming it is harmless, or updating its firmware first each creates risk without establishing what the device is.

  2. Question 27

    A SIEM alert shows that a PLC received a logic download from an engineering laptop at 2 a.m., and the change board has no matching record. What does the alert primarily give the security team?

    1. AProof that the PLC logic has been compromised by an attacker
    2. BA replacement for the formal change management process
    3. CAn automatic fix that restores the previous logic version
    4. DA correlated event to investigate against change records
    Show answer and explanation
    Correct answer: D

    A SIEM correlates events into alerts that analysts investigate, so this one is a lead to check against change records rather than proof of compromise. The alert does not fix the logic or replace change management, which are separate functions.

  3. Question 28

    A vulnerability scan reports hundreds of findings across an OT network. Which factor should most influence which finding is addressed first?

    1. AThe number of vendor logos printed in the report header
    2. BThe alphabetical order of device names in the scan report
    3. CThe age of the scanning tool that produced the report
    4. DAsset criticality, exploitability, and network exposure combined
    Show answer and explanation
    Correct answer: D

    Risk-based prioritization considers how important the asset is to the process, how easily it can be exploited, and how exposed it is to attackers. Alphabetical order, the age of the scanner, and vendor logos say nothing about actual risk.

  4. Question 29

    A vendor technician arrives with a USB drive containing firmware files and asks to load them onto an engineering workstation on the plant network. What should the plant do?

    1. ADisable antivirus on the workstation so the update runs faster
    2. BLoad the files directly because the vendor is an established trusted partner
    3. CCopy the files to a personal laptop so they can be reviewed
    4. DScan the drive on an isolated system and verify the firmware hash
    Show answer and explanation
    Correct answer: D

    Removable media and vendor files should be scanned on an isolated system and checked against the published firmware hash before use. Trusting the vendor, copying files to a personal device, or disabling antivirus each bypasses those safeguards.

  5. Question 30

    Why do OT teams often schedule patches for planned maintenance outages instead of applying them as soon as they are released?

    1. ATo allow testing, rollback planning, and coordination with operators
    2. BTo reduce the number of vendors the plant must contact for support
    3. CTo delay vulnerability disclosure until competitors have also patched
    4. DTo avoid recording the patch level in the asset inventory
    Show answer and explanation
    Correct answer: A

    Scheduled outages give OT teams time to test patches, prepare rollback steps, and coordinate with operators without interrupting production. Reducing vendor contacts, delaying disclosure, or skipping inventory records are not reasons for scheduling patches this way.