Free PSPO I practice test: 30 questions with answers

30 original questions for Professional Scrum Product Owner I (PSPO I), drawn from every topic area. Answer each one to see whether you got it right and why. No sign-up.

Free questions
30
Full bank
112 questions
Real exam
80 questions, 60 min
Passing score
85%

PSPO I exam guide: topics, cost and format

All 30 PSPO I questions with answers

The same questions as the test above, grouped by exam topic. Open any question to see the answer and explanation.

Understanding and Applying the Scrum Framework (10 questions)

  1. Question 1

    The team does not check its progress toward the Sprint Goal or the quality of its Increment until the Sprint Review, so problems are discovered late. Which empirical pillar is being neglected?

    1. AInspection of artifacts and progress
    2. BPredictability through a fixed upfront plan
    3. CCommitment to a stable scope of work
    4. DHierarchical control of decisions
    Show answer and explanation
    Correct answer: A

    Inspection means checking artifacts and progress frequently so that problems surface early, which is exactly what the team is skipping. Predictability through a fixed upfront plan works against empiricism, commitment is a Scrum value rather than a pillar, and hierarchical control is not one of Scrum's pillars.

  2. Question 2

    Which three pillars make up the empirical process control on which Scrum is founded? (Choose three.)

    1. ATransparency
    2. BHierarchy of approvals
    3. CInspection
    4. DAdaptation
    5. EFixed upfront scope
    Show answer and explanation
    Correct answer: A, C, D

    Scrum rests on empiricism, whose three pillars are transparency, inspection and adaptation. Hierarchy of approvals and fixed upfront scope both assume the outcome can be known in advance, which empiricism rejects.

  3. Question 3

    A stakeholder asks the Developers to move one specific item to the top of the Product Backlog so that it is taken into the next Sprint. The Developers agree without consulting anyone. Which Scrum rule is violated?

    1. AThe Developers may not talk to stakeholders about Sprint content
    2. BThe Product Owner alone is accountable for ordering the Product Backlog
    3. CProduct Backlog items may only be added during Sprint Planning
    4. DThe Scrum Master must approve every item placed in the Product Backlog
    Show answer and explanation
    Correct answer: B

    The Product Owner is accountable for ordering the Product Backlog, so the Developers should have referred the request to the Product Owner. The other options invent rules that Scrum does not contain: Developers may talk to stakeholders, the Scrum Master does not approve backlog items, and backlog items are not limited to Sprint Planning.

  4. Question 4

    Which statement about the Sprint is correct?

    1. AA Sprint may be extended by the Scrum Master whenever the team needs more time to finish
    2. BA Sprint's length may change from one iteration to the next by a team vote
    3. CA Sprint ends as soon as the Product Backlog has no remaining items
    4. DA Sprint is a time-box of one month or less in which a usable Increment is created
    Show answer and explanation
    Correct answer: D

    A Sprint is a time-box of one month or less, and Sprints keep consistent durations throughout a development effort. Extending a Sprint, varying its length by vote, or ending it when the backlog is empty are not Scrum rules.

  5. Question 5

    During a Sprint Review, stakeholders are unhappy with the direction of a feature, and the Developers propose saving all feedback for a later demonstration instead of discussing it now. Which purpose of the Sprint Review should guide the Product Owner?

    1. ATo assign each Product Backlog item to an individual Developer for the next Sprint
    2. BTo demonstrate progress to managers so they can approve next quarter's budget
    3. CTo approve the Definition of Done that all future Sprints must follow
    4. DTo inspect the Increment with stakeholders and adapt the Product Backlog
    Show answer and explanation
    Correct answer: D

    The Sprint Review is where the Scrum Team and stakeholders inspect the Increment and adapt the Product Backlog, so feedback belongs there rather than in a later demo. Budget approval, approval of the Definition of Done and assigning individual items are not purposes of the Sprint Review.

  6. Question 6

    What is the primary purpose of the Sprint Retrospective?

    1. ATo plan ways to increase the team's quality and effectiveness for the next Sprint
    2. BTo review the Increment with stakeholders and collect their feedback on features
    3. CTo estimate the Product Backlog items that will be considered for the next Sprint
    4. DTo evaluate the performance of each individual Developer so that growth plans can be set
    Show answer and explanation
    Correct answer: A

    The Sprint Retrospective inspects how the last Sprint went with regard to people, relationships, process and tools, and then plans improvements. Individual performance evaluation, stakeholder review of the Increment and backlog estimation belong to other activities or are not Scrum practices.

  7. Question 7

    In the Scrum Guide, which commitment is paired with the Increment?

    1. AThe Product Goal for the Product Backlog
    2. BThe Sprint Goal for the Sprint Backlog
    3. CAcceptance criteria written for each user story
    4. DThe Definition of Done for the Increment
    Show answer and explanation
    Correct answer: D

    Each artifact has a commitment: the Product Goal for the Product Backlog, the Sprint Goal for the Sprint Backlog, and the Definition of Done for the Increment. Acceptance criteria are useful to teams but are not a commitment defined in the Scrum Guide.

  8. Question 8

    A Developer marks a Product Backlog item as Done after coding, even though the agreed Definition of Done also requires integration testing and a review, and neither has happened. What is the most important consequence?

    1. AThe Scrum Master must reassign the item to a different Developer before the Review
    2. BThe Product Owner must shorten the next Sprint to recover the lost testing time
    3. CThe Increment does not meet the agreed Definition of Done, so progress is misreported
    4. DThe Developers should have asked the Product Owner to change the Sprint Goal earlier in the Sprint
    Show answer and explanation
    Correct answer: C

    When an item is not truly Done, the Increment is not usable and stakeholders receive a false picture of progress, because everyone must share one understanding of Done. The other options describe reassignments, Sprint length changes or Sprint Goal changes, none of which fixes the root problem.

  9. Question 9

    Halfway through a Sprint, the Developers realise the selected Product Backlog items are much larger than they planned, but the Sprint Goal is still valid. What is the appropriate action?

    1. ACancel the Sprint immediately, since the original forecast proved inaccurate for this work
    2. BRenegotiate the Sprint Backlog scope with the Product Owner while keeping the Sprint Goal
    3. CWork extra hours to finish every planned item exactly as it was originally described
    4. DAsk the Scrum Master to extend the Sprint by a week so the original scope fits
    Show answer and explanation
    Correct answer: B

    Developers can renegotiate the scope of the Sprint Backlog with the Product Owner as more is learned, while protecting the Sprint Goal. A Sprint is cancelled only when its Sprint Goal becomes obsolete, extra hours are not a sustainable answer, and a Sprint is not stretched to fit the scope.

  10. Question 10

    Who has the authority to cancel a Sprint?

    1. ASenior management, whenever the business strategy changes
    2. BThe Scrum Master, after consulting the Developers on the risks
    3. CThe Developers, by a majority vote during Sprint Planning
    4. DThe Product Owner, if the Sprint Goal becomes obsolete
    Show answer and explanation
    Correct answer: D

    Only the Product Owner has the authority to cancel a Sprint, and this is considered when the Sprint Goal becomes obsolete. The Scrum Master, the Developers and senior management do not hold that authority under the Scrum Guide.

Developing People and Teams (10 questions)

  1. Question 11

    A Product Owner starts assigning each Developer a specific task during the morning planning meeting, and the Developers say they feel micromanaged. Which Scrum principle is being violated?

    1. AThe Scrum Master is responsible for adopting Scrum across the organisation
    2. BThe Product Owner is accountable for ordering the Product Backlog
    3. CDevelopers decide how to turn Product Backlog items into a usable Increment
    4. DEach Developer must report individual progress at the start of every Daily Scrum
    Show answer and explanation
    Correct answer: C

    Scrum Teams are self-managing, so the Developers decide who does what, when and how rather than having the Product Owner assign tasks. The other options either name real Scrum accountabilities that this scenario does not touch or invent a rule that does not exist in the Scrum Guide.

  2. Question 12

    In the Scrum Guide, what does it mean that a Scrum Team is self-managing?

    1. AThe team decides internally who does the work, and how and when it is done
    2. BEach member is assigned a fixed set of tasks by the Product Owner at the start of the Sprint
    3. CThe team works without a Scrum Master, so that role is optional in each Sprint
    4. DThe team sets its own budget and chooses who it hires for each upcoming Sprint
    Show answer and explanation
    Correct answer: A

    Scrum Teams are self-managing: they decide internally who does what, when and how, without outside direction. The Scrum Master role is not optional, Product Owners do not assign tasks, and budgets and hiring are outside the Scrum Guide's definition.

  3. Question 13

    Which two statements describe how a self-managing Scrum Team works? (Choose two.)

    1. AIndividual Developers are judged by their personal velocity in each Sprint
    2. BThe team decides internally who does what, when and how
    3. CThe Product Owner dictates the technical design the Developers must use
    4. DThe whole Scrum Team is accountable for each usable Increment
    5. EThe Scrum Master assigns each Developer to a specialised component
    Show answer and explanation
    Correct answer: B, D

    Self-managing teams decide internally who does what, when and how, and the whole Scrum Team is accountable for the Increment. Personal velocity judgments, Product Owner technical dictation and Scrum Master assignment of components all conflict with that model.

  4. Question 14

    A product group has separate sub-groups for design, coding and testing. Work waits in handoff queues, and no sub-group can finish a usable Increment within a Sprint. Which change best fits Scrum?

    1. AAdd a separate approval committee to coordinate the handoffs between the sub-groups
    2. BHire additional Product Owners who manage the handoffs between the sub-groups
    3. CShorten each Sprint so that the handoffs happen more frequently during the month
    4. DForm one cross-functional Developers group that has the skills to deliver an Increment
    Show answer and explanation
    Correct answer: D

    Scrum Developers are cross-functional and have all the skills needed to create the Increment, so one cross-functional group removes the handoffs. An approval committee, shorter Sprints or extra Product Owners add coordination overhead and do not give the team the skills it lacks.

  5. Question 15

    In recent retrospectives, Developers rarely mention problems they see in the process. The Scrum Master wants them to discuss problems more openly. Which Scrum value is most relevant to this goal?

    1. AOpenness about the work and the challenges the team faces
    2. BFocus on the Sprint Goal, avoiding distractions from outside the team's work
    3. CRespect for decisions made only by senior managers in the company
    4. DCommitment to personal targets set by the organisation's managers
    Show answer and explanation
    Correct answer: A

    Openness is the Scrum value about sharing the work and its challenges, which is the behaviour the Scrum Master wants to encourage. Commitment, focus and respect are also Scrum values, but none of them describes speaking openly about problems, and the respect option wrongly limits respect to senior managers.

  6. Question 16

    A Scrum Master sees that the Developers always defer to one senior engineer when choosing the design approach for a Sprint. The Scrum Master wants the team to become more self-managing. What is the most appropriate action?

    1. ACoach the Developers to own the design decision together in facilitated discussion
    2. BAsk the Product Owner to name the design approach that the Developers will use
    3. CChoose the design approach personally so that decisions are made faster in the Sprint
    4. DRemove the senior engineer from the team so the others are forced to decide alone
    Show answer and explanation
    Correct answer: A

    The Scrum Master coaches the Developers toward self-management rather than directing them, so facilitating a discussion where they own the decision is right. Making the decision yourself, handing it to the Product Owner or removing a member are not the Scrum Master's role and do not build self-management.

  7. Question 17

    Which description best matches the Scrum Master's relationship with the Developers?

    1. AAssigning work to Developers based on their skills and their current availability
    2. BCoaching the Developers toward self-management and cross-functionality
    3. CApproving every change the Developers make to the Sprint Backlog before it takes effect
    4. DReporting each Developer's individual progress to senior management every week
    Show answer and explanation
    Correct answer: B

    The Scrum Master coaches the Developers in self-management and cross-functionality, as the Scrum Guide describes. Assigning work, approving every change and reporting individual progress to management each undermine the Developers' self-management.

  8. Question 18

    A product organisation splits the Developers of one product into a frontend sub-team and a backend sub-team. Each sub-team has its own Sprint Goal and its own internal hierarchy. According to the Scrum Guide, what is the concern?

    1. ASub-teams are the normal way to scale a Developers group in a large product
    2. BEach sub-team needs its own Scrum Master to coordinate its work with the other
    3. CScrum recognises no sub-teams or hierarchies within the Developers
    4. DEach sub-team should have a separate Product Owner to order its own work
    Show answer and explanation
    Correct answer: C

    The Scrum Guide states that Scrum recognises no sub-teams or hierarchies within the Developers, so the Scrum Team works toward one Sprint Goal. The other options describe structures that Scrum does not prescribe or endorse.

  9. Question 19

    A Scrum Team is considering whether to add one more specialist to help with testing. Which criterion from the Scrum Guide should guide this decision?

    1. AWhether the Product Owner has already approved the extra headcount in the department budget
    2. BWhether the new specialist will lead a separate testing sub-team inside the Developers
    3. CWhether the team stays nimble while holding all the skills it needs
    4. DWhether the team is still under a headcount limit set by the company's human resources policy
    Show answer and explanation
    Correct answer: C

    The Scrum Guide asks for a Scrum Team small enough to stay nimble but with every skill needed to create the Increment, so the team's skill needs and agility are the criteria. Sub-teams, budget approval and HR headcount limits are not what the Scrum Guide uses to decide team composition.

  10. Question 20

    Two Developers disagree sharply about whether a refactoring should happen this Sprint, and the argument is slowing the team. The Scrum Master wants the team to resolve it. What should the Scrum Master do first?

    1. ADecide the question personally, so the team can get back to the Sprint Goal quickly
    2. BFacilitate a discussion where the Developers weigh the trade-offs and agree a way forward
    3. CAsk the Product Owner to settle the disagreement, since the Product Owner decides how work is done
    4. DSplit the two Developers onto separate Sprint Backlogs so they stop having to work together
    Show answer and explanation
    Correct answer: B

    The Scrum Master facilitates, so that the Developers, who decide how the work is done, reach their own agreement. Deciding for them, handing the choice to the Product Owner or splitting the team does not build the team's self-management.

Managing Products with Agility (10 questions)

  1. Question 21

    Executives ask the Product Owner for a guaranteed delivery date for a large set of features, based on a fixed budget. The team has three Sprints of empirical data on its throughput. What is the most appropriate response?

    1. ACommit to the date and ask the Developers to work longer hours to meet it
    2. BRefuse to provide any estimate, since Scrum does not allow forecasts at all
    3. CShare a forecast range based on observed throughput, and update it after each Sprint
    4. DAsk the Scrum Master to set a firm date on the Product Owner's behalf, since they own forecasting
    Show answer and explanation
    Correct answer: C

    Scrum supports forecasts drawn from empirical data, and those forecasts are updated as the team learns. Committing to a guaranteed date through longer hours, refusing any forecast, or handing the date to the Scrum Master do not reflect the Scrum approach.

  2. Question 22

    Which artifact is the Developers' forecast of the functionality for the Sprint, together with a plan to deliver it?

    1. AThe Product Backlog, which lists every item the product might ever contain over time
    2. BThe Sprint Backlog, which holds the selected items and the plan for the Sprint
    3. CThe Definition of Done, which lists the quality checks the team has agreed to
    4. DThe Increment, which holds the sum of the completed Product Backlog items
    Show answer and explanation
    Correct answer: B

    The Sprint Backlog is the Developers' forecast of the functionality for the Sprint, plus a plan for delivering it. The Product Backlog is an ordered list of known work, the Increment is the sum of completed items, and the Definition of Done is a quality commitment rather than a forecast.

  3. Question 23

    A new Product Owner faces six conflicting stakeholder requests and no written direction for the product. Which basis gives the best way to order these requests?

    1. AThe request from the loudest stakeholder, so the relationship stays positive
    2. BThe order in which the requests were received by the team
    3. CThe product vision and goal, used to judge each request's contribution to value
    4. DThe requests with the largest estimated effort, so that the hardest work is tackled first
    Show answer and explanation
    Correct answer: C

    A product vision and product goal give the Product Owner a long-term direction against which each request can be judged for its contribution to value. Ordering by loudness, arrival time or effort ignores value and the product's direction.

  4. Question 24

    A team measures its success by counting the backlog items it completes each Sprint. The Product Owner wants a better measure of real product value. Which measure fits best?

    1. AItems completed each Sprint, since completed work always means value has been delivered
    2. BCustomer outcomes such as satisfaction, product usage, or revenue from the product
    3. CStory points delivered per Sprint compared with the previous Sprint's total
    4. DThe number of Sprint Reviews held in a quarter as a sign of stakeholder engagement
    Show answer and explanation
    Correct answer: B

    Product value is measured by outcomes for customers and the business, not by output or activity. Completed items, story points and the number of meetings measure output or activity, which can rise while real value stays flat.

  5. Question 25

    A Product Owner wants the Product Backlog to be genuinely useful to the Developers. Which practice best supports that goal?

    1. AKeep all items at the same level of detail regardless of how soon they will be worked on
    2. BLet the Scrum Master write every item so that the wording stays consistent across the list
    3. CDelay refinement of all items until the Sprint Review, when stakeholders can react
    4. DRefine the top items so they are clear and small enough to be selected for a Sprint
    Show answer and explanation
    Correct answer: D

    Refinement makes the items at the top of the Product Backlog more detailed and small enough for the Developers to select in a Sprint, which keeps the backlog useful. Uniform detail, Scrum Master authorship of items and delaying refinement until the Review all work against that goal.

  6. Question 26

    Which two statements describe Product Owner responsibilities for the Product Backlog? (Choose two.)

    1. AThe Developers are the only people allowed to add items to the Product Backlog
    2. BThe Scrum Master decides the order of items by their estimated effort
    3. CThe Product Owner orders the items so that the most valuable work is at the top
    4. DItems at the bottom must be fully estimated before the Sprint Planning begins
    5. EThe Product Owner ensures the Product Backlog is visible, transparent and clear
    Show answer and explanation
    Correct answer: C, E

    The Product Owner orders the Product Backlog to maximise value and ensures it is visible, transparent and clear. The Developers do not hold sole rights to add items, the Scrum Master does not order items, and items at the bottom do not need full estimates before Sprint Planning.

  7. Question 27

    A company changes its strategy to focus on enterprise customers instead of consumers. The Product Owner must respond. What is the most appropriate response?

    1. ARevisit the Product Goal and reorder the Product Backlog to reflect the new strategy
    2. BIgnore the change until the current Sprint is finished, so that work is not disrupted
    3. CAsk the Developers to rewrite the Definition of Done for enterprise customers only
    4. DForm a separate Scrum Team for each customer type without consulting the stakeholders
    Show answer and explanation
    Correct answer: A

    Business strategy shapes the Product Goal, and the Product Owner keeps the Product Backlog aligned with it. Ignoring the change, rewriting the Definition of Done for one customer type, or creating teams without consultation do not respond to the strategy.

  8. Question 28

    At a Sprint Review, a key customer representative says the new feature is hard to use. The Product Owner needs to decide the next steps. What is the best action?

    1. ACapture the feedback and adapt the Product Backlog, ordering follow-up work by its value
    2. BExplain to the customer why they are mistaken, so the release date can be kept as planned
    3. CAsk the Scrum Master to hold the feedback until the next scheduled release
    4. DMove the feedback into a report that goes only to senior management
    Show answer and explanation
    Correct answer: A

    The Sprint Review is where stakeholder feedback is gathered, and the Product Owner adapts the Product Backlog by value. Dismissing the customer, delaying the feedback or hiding it from the team ignores the empirical feedback loop that Scrum relies on.

  9. Question 29

    Which event gives stakeholders their main opportunity to inspect the Increment and give feedback?

    1. AThe Daily Scrum, where the Developers plan the work for the next day
    2. BThe Sprint Review, where the Scrum Team and stakeholders inspect the Increment
    3. CThe Sprint Retrospective, where the team reviews how it worked together
    4. DThe Sprint Planning meeting, where the team agrees on the Sprint Goal
    Show answer and explanation
    Correct answer: B

    The Sprint Review is the event where the Scrum Team and stakeholders inspect the Increment and provide feedback that adapts the Product Backlog. The Daily Scrum, Sprint Planning and Sprint Retrospective are primarily internal to the Scrum Team.

  10. Question 30

    A Product Owner wants to tell the business when the next release could realistically ship. Which evidence gives the most useful basis for that forecast?

    1. AThe Developers' individual estimates of how many hours each of their own items will take in total
    2. BThe Scrum Master's view of how confident the team feels about the coming months
    3. CThe length of each Sprint multiplied by the number of Developers in the team
    4. DThe team's observed throughput over recent Sprints, applied to the remaining Product Backlog
    Show answer and explanation
    Correct answer: D

    Observed throughput from recent Sprints, applied to the work still left in the Product Backlog, gives a forecast grounded in what the team has actually delivered. Individual hour estimates, feelings of confidence and multiplying Sprint length by headcount do not reflect actual delivery.